# RECYNEX site survey worksheet

Use this worksheet to prepare a project discussion. Installation and electrical work require the approved configuration documents and qualified personnel.

## Site and visitor route

- Site name, address and operating hours:
- Site owner and project contact:
- Proposed position and measured floor plan:
- Photographs of the approach, queue and exit route:
- Accessibility, circulation and emergency-exit constraints:
- Approved equipment drawing and version, if available:
- Full service-door clearance and route for removing material:
- Landlord, building or local approvals required:

## Utilities and exposure

- Responsible electrical installer and available supply:
- Network type, owner and expected offline behavior:
- Rain, sun, temperature, condensation or drainage exposure:
- Security, fixing and cleaning constraints:

## Packaging and operation

- Approved sample list and qualification version:
- Rejected-item instructions:
- Daily inspection and cleaning owner:
- Full-container trigger, collector and downstream receiver:
- Fault escalation and out-of-service communication:
- Existing app, reporting platform or reward programme:

## Decision record

- Configuration being assessed:
- Open constraints, responsible owner and review date:
- Pilot or installation acceptance evidence:
- Parties approving the next step:

Replace planning assumptions with tested, approved equipment and site documentation before procurement or installation.