RECYNEX Max | Storage-led return point film

Inspect the Max cabinet direction for sites planning a longer collection interval.

Product and process films describe design directions. Project specifications govern delivered equipment and software.

Max addresses a return point where holding space and the collection interval need special attention. The film shows the product form; the site review determines the material mix, storage arrangement and safe removal route.

Explore RECYNEX Max · Discuss a configuration

Turn your site brief into a configuration

Share the location, container stream, operating team and systems already in place.